A tight cluster of new apartment blocks inside a factory and warehouse zone at the far south-west of Dubai. Every project we list starts with a studio. Rental yields are high, and there is little around you yet.
13 kmin a straight line to the nearest metro, Life Pharmacy (formerly UAE Exchange)
12 kmin a straight line to Al Maktoum International Airport
2027 to 2029when most projects we list are due, half of them in 2027
Dubai Industrial City is mostly factories and warehouses. The homes sit close together: nearly every project we list is within 0.5 km of the centre. On ready flats, DLD gross yields run from 8.7% to 9.8%. In the year to September 2026, ready studios sold at a median of AED 425,000. The cost is distance. There is no metro, mall, school or park within 5 km in a straight line, and the local roads carry industrial traffic. It suits you if you work in the zone, or if you buy to rent to people who do.
Samana Hills South, image 3South Lofts, image 5
Swim
Every project we list mentions a pool, so your building is where you swim. The nearest public beach is about 13 km away in a straight line.
Your building's pool
Every project we list
Each listing mentions a pool. Ask to see it on the plans, with its size, before you pay a deposit.
Jebel Ali Open Beach
13 km in a straight line
The nearest public beach, to the north. The beaches at JBR and Dubai Marina are about 25 km away.
Elanora by Zoya, image 1
Eat
The zone is built for work, so there are few places to eat inside it. For a proper meal or a big shop, you drive out.
The Outlet Village
5.4 km
An outlet mall about 5.4 km away in a straight line, the nearest mall on our map.
Samana Hills South Haven, image 1
A Saturday in Dubai Industrial City
A weekend in a work district: a pool at home, and a drive for everything else.
8:00A morning swim in your building's pool, the one facility every project here lists.
11:00Shopping and lunch at The Outlet Village, about 5.4 km away in a straight line.
16:00A swim in the sea at Jebel Ali Open Beach, the nearest public beach.
19:30Dinner in Dubai Marina, about 25 km away in a straight line.
What homes cost
Off-plan apartments sold most often here, at a median of AED 614,000 in the last 12 months.
The median is the middle price: half the homes sold for more, half for less. A sea view or a high floor can cost a lot more than the median.
Source: Dubai Land Department, sales in the 12 months to Sep 30, 2026.
Ready apartments
Studio52 salesAED 425,000
1 bedroom14 salesNot enough sales for a median. A median needs at least 30 sales in 12 months.
2 bedrooms28 salesNot enough sales for a median. A median needs at least 30 sales in 12 months.
Off-plan apartments
Studio497 salesAED 572,000
1 bedroom232 salesAED 918,000
2 bedrooms35 salesAED 1,268,000
Ready villas
1 bedroom4 salesNot enough sales for a median. A median needs at least 30 sales in 12 months.
3 bedrooms14 salesNot enough sales for a median. A median needs at least 30 sales in 12 months.
4 bedrooms4 salesNot enough sales for a median. A median needs at least 30 sales in 12 months.
Off-plan villas
4 bedrooms19 salesNot enough sales for a median. A median needs at least 30 sales in 12 months.
Ready apartments: median price in the 12 months to each dateReady apartments: the median price went from AED 752,000 in the 12 months to Dec 31, 2024 to AED 554,000 in the 12 months to Sep 30, 2026.
Dec 31, 2024AED 752,000
Sep 30, 2026AED 554,000
Show as tableShow as chart
12 months to
Median price
Sales
Sep 30, 2026
AED 554,000
103 sales
Jun 30, 2026
AED 554,000
105 sales
Mar 31, 2026
AED 793,000
174 sales
Dec 31, 2025
AED 793,000
188 sales
Sep 30, 2025
AED 793,000
169 sales
Jun 30, 2025
AED 793,000
226 sales
Mar 31, 2025
AED 800,000
190 sales
Dec 31, 2024
AED 752,000
234 sales
Sales in 12 months
970
Off-plan: 783 sales, against 187 ready homes
81%
Ready apartments: median price
AED 554,000
Ready apartments: median price per sq ft
AED 1,000 per sq ft
Ready apartments: median price compared with a year earlier
Down 30%
Sales and rents from Dubai Land Department open data. DLD area: Saih Shuaib 2.
Rents and yields
The median yearly rent of new Ejari contracts, and the gross yield: a year's rent before costs, as a share of the median price of ready homes. We show a yield only where both have at least 30 contracts and sales.
Ready apartments
Bedrooms
Median rent a year
Contracts
Gross yield
Studio
AED 38,000
381
8.9%
1 bedroom
AED 55,000
251
–
2 bedrooms
AED 70,000
158
8.7%
Ready villas
Bedrooms
Median rent a year
Contracts
Gross yield
3 bedrooms
AED 88,000
53
–
Rents from Ejari, Dubai's register of rent contracts, Apr 1, 2025 to Mar 31, 2026. Prices from Dubai Land Department.
Questions people ask
Is Dubai Industrial City good for families?
Not yet. Every project we list starts with a studio, and only some of Dugasta's Al Haseen buildings go up to 3 beds. The nearest schools on our map are about 19 km away in a straight line, and the nearest park about 15 km. The one hospital close by is the Jebel Ali Emergency and Trauma Center, 3.5 km away. It suits single buyers, couples who work nearby, and investors.
Is there a metro in Dubai Industrial City?
No. The nearest station, Life Pharmacy on the Red Line, is about 13 km away in a straight line, and Expo 2020 station about 15 km. Dubai Marina is about 25 km away and Burj Khalifa 43 km, so you will need a car.
What will a studio cost in Dubai Industrial City?
In the projects we list, starting prices run from about AED 475,000 to AED 680,000, and all of them start with a studio. In DLD sales in the year to September 2026, off-plan studios sold at a median of about AED 572,000 and ready studios at AED 425,000. Prices were checked in November 2026.
Is Dubai Industrial City good for rental yield?
On paper, yes. DLD gross yields on ready flats here are 8.9% for studios, 9.8% for 1-beds and 8.7% for 2-beds, from Ejari rents against sale prices. They are gross figures, before service charges and empty months. Most tenants are likely to be people who work nearby.
When will the projects be finished?
Most of the projects we list are due between 2027 and 2029, half of them in 2027. Al Haseen Residence was due in March 2026, so that date may be out of date: ask Dugasta. In the DLD register for this area, most of the unfinished projects show no building work yet.
What a post-handover plan means for your title deed, a resale and the real cost, how it compares with a mortgage, and projects that advertised one in 2026.
9 min read
Ask us about Dubai Industrial City
Tell us what you're looking for in Dubai Industrial City. We'll send you the projects that fit, with prices and payment plans.